Deploying the BIG-IP system v10.1 and later with SAP Enterprise Portal. Includes BIG-IP WAN Optimization Module (WOM), Edge Gateway and WebAccelerator configuration. Our testing environment included both SAP ERP 6.0 based on NetWeaver 7.0, SAP NetWeaver 2004, mySAP ERP 2005. Document Version 1.2