Power-constrained growth planner

When the grid connection is the ceiling, efficiency is the only headroom. Plan against megawatts, not GPUs.

Most operators building in 2026 will run out of power before they run out of capital or demand. This planner works in the unit that actually binds: how many nodes a grid connection supports, what a megawatt earns, and how many months of growth an efficiency gain buys before the cap bites.

01: The power envelope

02: What the power earns

The power envelope

Each cell is 1% of the committed megawatts. Filled cells are already spoken for.

More Info

For a growing AI operator the binding constraint is rarely capital or demand—it is the grid connection, which takes years to expand. That turns efficiency from a cost story into a growth story: recovered output per node is indistinguishable from new megawatts, except that it arrives in weeks and needs no permit. Revenue per megawatt is the metric that makes those trade-offs comparable.

Frequently asked questions

Where this leads

From AI factory math to AI factory control

Routing, caching, and utilization recovery raise delivered output per node without adding a watt. Inside a fixed power envelope, that is the difference between growing and waiting for the utility.